This paper focuses on series systems' dynamic opportunistic maintenance scheduling. Based on the machine-level predictive maintenance (PdM) method, a novel TOC–VLLTW methodology combined theory of constraints (TOC) policy and variable lead-lag time window (VLLTW) policy is proposed. The TOC policy provides machines' priorities according to their PdM durations to decrease system downtime when scheduling opportunistic maintenance. The VLLTW policy provides variable lead-lag time windows against different machines, allowing for more flexible and economic system opportunistic maintenance schedules. This proposed methodology is demonstrated through the case study based on the collected reliability information from a quayside container system. The results can effectively prove the effectiveness of the TOC–VLLTW methodology.

References

1.
You
,
M.
,
Li
,
L.
,
Meng
,
G.
, and
Ni
,
J.
,
2010
, “
Cost-Effective Updated Sequential Predictive Maintenance Policy for Continuously Monitored Degrading Systems
,”
IEEE Trans. Autom. Sci. Eng.
,
7
(
2
), pp.
257
265
.
2.
Alsyouf
,
I.
,
2009
, “
Maintenance Practices in Swedish Industries: Survey Results
,”
Int. J. Prod. Econ.
,
121
(
1
), pp.
212
223
.
3.
Joshi
,
P.
,
Imadabathuni
,
M.
,
He
,
D.
,
Al-Kateb
,
M.
, and
Bechhoefer
,
E.
,
2012
, “
Application of the Condition Based Maintenance Checking System for Aircrafts
,”
J. Intell. Manuf.
,
23
(
2
), pp.
277
288
.
4.
Mobley
,
R. K.
,
2002
,
An Introduction to Predictive Maintenance
,
Butterworth-Heinemann
,
Woburn, MA
.
5.
Muchiri
,
P. N.
,
Pintelon
,
L.
,
Martin
,
H.
, and
De Meyer
,
A. M.
,
2010
, “
Empirical Analysis of Maintenance Performance Measurement in Belgian Industries
,”
Int. J. Prod. Res.
,
48
(
20
), pp.
5905
5924
.
6.
Xia
,
T.
,
Xi
,
L.
,
Zhou
,
X.
, and
Lee
,
J.
,
2013
, “
Condition-Based Maintenance for Intelligent Monitored Series System With Independent Machine Failure Modes
,”
Int. J. Prod. Res.
,
51
(
15
), pp.
4585
4596
.
7.
Jardien
,
K.
,
Lin
,
D.
, and
Banjevic
,
D.
,
2006
, “
A Review on Machinery Diagnostics and Prognostics Implementing Condition-Based Maintenance
,”
Mech. Syst. Signal Process.
,
20
(
7
), pp.
1483
1510
.
8.
Li
,
L.
,
You
,
M.
, and
Ni
,
J.
,
2009
, “
Reliability-Based Dynamic Maintenance Threshold for Failure Prevention of Continuously Monitored Degrading Systems
,”
ASME J. Manuf. Sci. Eng.
,
131
(
3
), p.
031010
.
9.
Chen
,
N.
,
Chen
,
Y.
,
Li
,
Z.
,
Zhou
,
S.
, and
Sievenpiper
,
C.
,
2011
, “
Optimal Variability Sensitive Condition-Based Maintenance With a Cox PH Model
,”
Int. J. Prod. Res.
,
49
(
7
), pp.
2083
2100
.
10.
Zhou
,
X.
,
Xi
,
L.
, and
Lee
,
J.
,
2007
, “
Reliability-Centered Predictive Maintenance Scheduling for a Continuously Monitored System Subject to Degradation
,”
Reliab. Eng. Syst. Saf.
,
92
(
4
), pp.
530
534
.
11.
Liao
,
W.
,
Wang
,
Y.
, and
Pan
,
E.
,
2012
, “
Single-Machine-Based Predictive Maintenance Model Considering Intelligent Machinery Prognostics
,”
Int. J. Adv. Manuf. Technol.
,
63
(
1–4
), pp.
51
63
.
12.
Xia
,
T.
,
Xi
,
L.
,
Zhou
,
X.
, and
Lee
,
J.
,
2011
, “
Optimal CBPM Policy Considering Maintenance Effects and Environmental Condition
,”
Int. J. Adv. Manuf. Technol.
,
56
(
9–12
), pp.
1181
1193
.
13.
Liao
,
G.
,
Chen
,
Y.
, and
Sheu
,
S.
,
2009
, “
Optimal Economic Production Quantity Policy for Imperfect Process With Imperfect Repair and Maintenance
,”
Eur. J. Oper. Res.
,
195
(
2
), pp.
348
357
.
14.
Yin
,
M.
,
Angus
,
J. E.
, and
Trivedi
,
K. S.
,
2013
, “
Optimal Preventive Maintenance Rate for Best Availability With Hypo-Exponential Failure Distribution
,”
IEEE Trans. Reliab.
,
62
(
2
), pp.
351
361
.
15.
Jin
,
X.
, and
Ni
,
J.
,
2013
, “
Joint Production and Preventive Maintenance Strategy for Manufacturing Systems With Stochastic Demand
,”
ASME J. Manuf. Sci. Eng.
,
135
(
3
), p.
031016
.
16.
Zhou
,
X.
,
Xi
,
L.
, and
Lee
,
J.
,
2009
, “
Opportunistic Preventive Maintenance Scheduling for a Multi-Unit Series System Based on Dynamic Programming
,”
Int. J. Prod. Econ.
,
118
(
2
), pp.
361
366
.
17.
Chang
,
Q.
,
Ni
,
J.
,
Bandyopadhyay
,
P.
,
Biller
,
S.
, and
Xiao
,
G.
,
2007
, “
Maintenance Opportunity Planning System
,”
ASME J. Manuf. Sci. Eng.
,
129
(
3
), pp.
661
668
.
18.
Hou
,
W.
, and
Jiang
,
Z.
,
2013
, “
An Opportunistic Maintenance Policy of Multi-Unit Series Production System With Consideration of Imperfect Maintenance
,”
Appl. Math. Inf. Sci.
,
7
(
1
), pp.
283
290
.
19.
Gu
,
X.
,
Jin
,
X.
, and
Ni
,
J.
,
2015
, “
Prediction of Passive Maintenance Opportunity Windows on Bottleneck Machines in Complex Manufacturing Systems
,”
ASME J. Manuf. Sci. Eng.
,
137
(
3
), p.
031017
.
20.
Yang
,
Z.
,
Chang
,
Q.
,
Djurdjanovic
,
D.
,
Ni
,
J.
, and
Lee
,
J.
,
2007
, “
Maintenance Priority Assignment Utilizing On-Line Production Information
,”
ASME J. Manuf. Sci. Eng.
,
129
(
2
), pp.
435
446
.
21.
Nourelfath
,
M.
,
Fitouhi
,
M.
, and
Machani
,
M.
,
2010
, “
An Integrated Model for Production and Preventive Maintenance Planning in Multi-State Systems
,”
IEEE Trans. Reliab.
,
59
(
3
), pp.
496
506
.
22.
Chang
,
Q.
,
Biller
,
S.
, and
Xiao
,
G.
,
2010
, “
Transient Analysis of Downtimes and Bottleneck Dynamics in Serial Manufacturing Systems
,”
ASME J. Manuf. Sci. Eng.
,
132
(
5
), p.
051015
.
23.
Li
,
L.
,
Chang
,
Q.
,
Xiao
,
G.
, and
Ambani
,
S.
,
2011
, “
Throughput Bottleneck Prediction of Manufacturing Systems Using Time Series Analysis
,”
ASME J. Manuf. Sci. Eng.
,
133
(
2
), p.
021015
.
24.
Koochaki
,
J.
,
Bokhorst
,
J. A. C.
,
Wortmann
,
H.
, and
Klingenberg
,
W.
,
2012
, “
Condition Based Maintenance in the Context of Opportunistic Maintenance
,”
Int. J. Prod. Res.
,
50
(
23
), pp.
6918
6929
.
25.
Pham
,
H.
, and
Wang
,
H.
,
1996
, “
Imperfect Maintenance
,”
Eur. J. Oper. Res.
,
94
(
3
), pp.
425
438
.
26.
Liao
,
W.
,
Pan
,
E.
, and
Xi
,
L.
,
2010
, “
Preventive Maintenance Scheduling for Repairable System With Deterioration
,”
J. Intell. Manuf.
,
21
(
6
), pp.
875
884
.
You do not currently have access to this content.