Flexible fixturing is a necessary aspect of Flexible Manufacturing Systems (FMS) and Computer-Integrated Manufacturing Systems (CIMS). Modular fixtures are most widely used in industry for job and batch production. Computer-Aided Fixture Design (CAFD) has become a research focus in implementing FMS and CIMS. Fixture configuration design is an important issue in the domain of CAFD. A review of the current research in CAFD indicates that a major problem impeding the automated generation of fixture configurations is the lack of studies on fixture structures. This paper investigates fundamental structures of dowel-pin based modular fixtures and fixturing characteristics of commonly used modular fixture elements. A Modular Fixture Element Assembly Relationship Graph (MFEARG) is designed to represent combination relationships between fixture elements. Based on MFEARG, algorithms are developed to search all suitable fixturing unit candidates and mount them into appropriate positions on a baseplate with interference checking. A prototype system for automated design of dowel-pin modular fixture configurations is presented in this paper. Fixture design examples are given at the end of the paper.

1.
Thompson
 
B. S.
, and
Gandhi
 
M. V.
, “
Commentary on Flexible Fixturing
,”
Applied Mechanics Review
, Vol.
39
, No.
9
,
1986
, pp.
1365
1369
.
2.
Nee, A. Y. C., and Kumar, A. Senthil, “A Framework for an Object/Rule-based Automated Fixture Design System,” Annals of the CIRP, 1991, pp. 147–151.
3.
Trappey
 
A. J. C.
, and
Liu
 
C. R.
, “
A Literature Survey of Fixture-Design Automation
,”
Int. J. of Advanced Manufacturing Technology
, Vol.
5
, No.
3
,
1990
, pp.
240
255
.
4.
Zhu, Y., et al. Modular Fixtures: Theory and Application, Machinery Press, Beijing, China, 1990.
5.
Joneja, A., and Chang, T. C., “A Generalized Framework for Automatic Planning of Fixture Configuration,” Advances in Manufacturing Systems Engineering, ASME WAM, San Francisco, CA, Dec. 10–15, 1989, pp. 17–28.
6.
Chang
 
C. H.
, “
Computer-Assisted Fixture Planning for Machining Processes
,”
Manufacturing Review
, Vol.
5
, No.
1
,
1992
, pp.
15
28
.
7.
Ferreira, P. M., and Liu, C. R., “Generation of Workpiece Orientations for Machining Using a Rule-based System,” International Journal of Robotics and Computer-integrated Manufacturing Systems, Vol. 5, 1988.
8.
Chou
 
Y. C.
,
Chandra
 
V.
, and
Barash
 
M. M.
, “
A Mathematical Approach to Automatic Configuration of Machining Fixtures: Analysis and Synthesis
,”
ASME Journal of Engineering for Industry
, Vol.
111
,
1989
, pp.
299
306
.
9.
De Meter, E. C., “Selection of Fixture Configuration for the Maximization of Mechanical Leverage,” Manufacturing Science and Engineering, ASME WAM, New Orleans, LA, Nov. 28–Dec. 2, 1993, PED-Vol. 4, pp. 491–506.
10.
Menassa, R. J., and DeVries, W., “A Design Synthesis and Optimization Method for Fixtures with Compliant Elements,” Advances in Integrated Product Design and Manuf., ASME WAM, PED-Vol. 47, Dallas, TX, Nov. 25–30, 1990, pp. 203–218.
11.
Mani, M., and Wilson, W. R. D., “Automated Design of Workholding Fixtures using Kinematic Constraint Synthesis,” 16th NAMRC, 1988, pp. 437–444.
12.
Markus
 
A.
,
Markusek
 
E.
,
Farkas
 
J.
, and
Filemon
 
J.
, “
Fixture Design Using Prolog: an Expert System
,”
Robotics and CIMS
, Vol.
1
, No.
2
,
1984
, pp.
167
172
.
13.
Pham
 
D. T.
, and de
Sam Lazaro
 
A.
, “
AUTOFIX—an Expert CAD System for Jig and Fixtures
,”
Int. J. of Machine Tools & Manufacture
, Vol.
30
, No.
3
,
1990
, pp.
403
411
.
14.
Sakal, R., and Chow, J. G., “A Semigenerative Computer-aided Fixture Design System Using Autocad and CAD Fixturing Database,” Computer-aided Production Engineering, Cookeville, TN, Aug. 13–14, 1991, pp. 461–458.
15.
Goldberg, K., and Brost, R., “A Complete Algorithm for Designing Modular Fixtures for Polygonal Parts,” IEEE International Conference on Robotics and Automation, San Diego, CA, May, 1994.
16.
Whybrew
 
K.
, and
Ngoi
 
B. K. A.
, “
Computer-aided Design of Modular Fixture Assembly
,”
Int. J. of Adv. Manuf. Tech.
, Vol.
7
,
1990
, pp.
267
276
.
17.
Trappey, A. J. C., Su, C. S., and Huang, S. H., “Methodology for Location and Orientation of Modular Fixtures,” Manufacturing Science and Engineering, ASME WAM, New Orleans, LA, Nov. 28–Dec. 2, 1993, PED-Vol. 64, pp. 333–342.
18.
Rong, Y., Zhu, J., and Li, S., “Fixturing Feature Analysis for Computer-Aided Fixture Design,” Manufacturing Science and Engineering, ASME WAM, New Orleans, LA, Nov. 28–Dec. 2, 1993, PED-Vol. 64, pp. 267–271.
19.
Hoffman, E. G., Modular Fixturing, Manufacturing Technology Press, Lake Geneva, Wisconsin, 1987.
20.
Rong, Y., and Bai, Y., “Machining Accuracy Analysis for Computer-Aided Fixture Design,” ASME Journal of Engineering for Industry, Feb, 1996 (in press); partially presented at Symposium on Modeling, Monitoring & Control Issues in Machining Processes, ASME WAM, New Orleans, LA, Nov. 28–Dec. 3, 1993, PED-Vol. 64, pp. 507–512.
21.
Rong, Y., Li, W., and Bai, Y., “Locating Error Analysis for Computer-Aided Fixture Design and Verification,” ASME Computers in Engineering, Boston, MA, Sep. 17–21, 1995, pp. 825–832.
22.
Rong, Y., Wu, S., and Chu, T., “Automatic Verification of Clamping Stability in Computer-aided Fixture Design,” ASME Computers in Engineering, Minneapolis, MN, Sep. 11–14, 1994, pp. 421–426.
23.
Zhu, Y., Zhang, S., and Rong, Y., “Experimental Study on Fixturing Stiffness of T-slot Based Modular Fixtures,” NAMRC XXI, Stillwater, OK, May 19–21, 1993, pp. 231–235.
24.
Rong, Y., and Zhu, Y., “Computer-aided Fixture Design and Management,” 9th Int. CAD/CAM, Robotics and Factories of the Future Conf., Newark, NJ, Aug. 18–20, 1993.
25.
Bai, Y., and Rong, Y., “Automated Modular Fixture Design,” Research Report, Southern Illinois University at Carbondale, Dec. 1993.
26.
Foley, J. D., Dam, A., Feiner, S. K., and Hughes, J. F., Computer Graphics: Principles and Practice, Addison-Wesley, Reading, MA, 1989.
This content is only available via PDF.
You do not currently have access to this content.