This paper discusses complexities and challenges of managing boil off gas (BOG) in liquefied natural gas (LNG) liquefaction plants. Most publications in the past have focused on regasification terminals and have not addressed the area of liquefaction plants. The paper discusses the generation and management of BOG and the associated networks and machinery to manage it. BOG options available for both Greenfield plants and in debottlenecking situations are covered. The advantages and disadvantages of different options and compressor systems are covered and the concept of dynamic simulation as an analysis tool is addressed.

References

1.
BP,
2012
,
BP Energy Outlook 2030
, BP plc,
London
, available at: http://www.bp.com/content/dam/bp/pdf/statistical-review/BP_World_Energy_Outlook_booklet_2013.pdf
2.
Meher-Homji
,
C. B.
,
Yates
,
D.
,
Weyermann
,
H. P.
,
Masani
,
K.
,
Ransbarger
,
W.
, and
Gandhi
,
S.
,
2007
, “
Aeroderivative Gas Turbine Drivers for the ConocoPhillips Optimized Cascade LNG Process—World's First Application and Future Potential
,”
15th International Conference on Liquefied Natural Gas (LNG15)
,
Barcelona, Spain
, Apr. 24–27, Paper No. PS2-6.
3.
Meher-Homji
,
C. B.
,
Matthews
,
T.
,
Pelagotti
,
A.
, and
Weyermann
,
H. P.
,
2011
, “
LNG Turbomachinery
,”
Proceedings of the 1st Middle East Turbomachinery Symposium (METS-I)
,
Doha, Qatar
, Feb. 13–16.
4.
Shin
,
M. W.
,
Jang
,
N.
,
Shin
,
D.
,
Han
,
C.
,
Choi
,
S. H.
, and
Yoon
,
E. S.
,
2009
, “
A Method of Optimal Operating of BOG Compressors in a LNG Gasification Plant
,”
First Annual Gas Processing Symposium
, Doha, Qatar, Jan. 10–12.
5.
Park
,
C.
,
Lee
,
C. J.
,
Lim
,
Y.
,
Lee
,
S.
, and
Han
,
C.
,
2010
, “
Optimization of Recirculation Operating in Liquefied Natural Gas Receiving Terminal
,”
J. Taiwan Inst. Chem. Eng.
,
41
(
4
), pp.
482
491
.10.1016/j.jtice.2010.04.014
6.
Shin
,
M. W.
,
Shin
,
D.
,
Choi
,
S. H.
,
Yoon
,
E. S.
, and
Han
,
C.
,
2007
, “
Optimization of the Operation of Boil-Off Gas Compressors at a Liquefied Natural Gas Gasification Plant
,”
Ind. Eng. Chem. Res.
,
46
(
20
), pp.
6540
6545
.10.1021/ie061264i
7.
Sayyaadi
,
H.
, and
Babaelahi
,
M.
,
2010
, “
Thermoeconomic Optimization of a Cryogenic Refrigeration Cycle for Re-Liquefaction of the LNG Boil-off Gas
,”
Int. J. Refrig.
,
33
(
6
), pp.
1197
1207
.10.1016/j.ijrefrig.2010.03.008
8.
Shin
,
Y.
, and
Lee
,
Y. P.
,
2009
, “
Design of a Boil-Off Natural Gas Reliquefaction Control System for LNG Carriers
,”
Appl. Energy
,
86
(
1
), pp.
37
44
.10.1016/j.apenergy.2008.03.019
9.
Querol
,
E.
,
Gonzalez-Regueral
,
B.
,
García-Torrent
,
J.
, and
García-Martínez
,
M. J.
,
2010
, “
Boil Off Gas (BOG) Management in Spanish Liquid Natural Gas (LNG) Terminals
,”
Appl. Energy
,
87
(
11
), pp.
3384
3392
.10.1016/j.apenergy.2010.04.021
10.
Han
,
C.
, and
Lim
,
Y.
,
2012
, “
LNG Processing: From Liquefaction to Storage
,”
11th International Symposium on Process Systems Engineering
,
Singapore
, July 15–19, pp.
925
929
.
11.
Pillai
,
P.
,
Messersmith
,
D.
,
Yao
,
J.
,
Chaker
,
M.
, and
Meher-Homji
,
C. B.
,
2013
, “
BOG Optimization in LNG Plants
,”
92nd Gas Producers Association Conference
,
San Antonio, TX
, Apr. 7–10, pp.
99
106
.
12.
Faruque Hasan
,
M. M.
,
Zheng
,
A. M.
, and
Karimi
,
I. A.
,
2009
, “
Minimizing Boil‐Off Losses in Liquefied Natural Gas Transportation
,”
Ind. Eng. Chem. Res.
,
48
(
21
), pp.
9571
9580
.10.1021/ie801975q
13.
Cryostar, 2010, “Special Report: Reliquefaction System EcoRel,” The Cryostar Magazine, Autumn, available at: http://www.cryostar.com/magazine/cryostar_magazine10.pdf
14.
Dresser-Rand, 2004, “
Boil Off Gas Compressors
,” Dresser-Rand Corp., Houston, TX, available at: http://www.dresser-rand.com/literature/recip/2080-BOGcomp.pdf
15.
Brink
,
S.-E.
,
2010
, “
LNG16 X-Pert Center: Single Shaft Turbocompressor for BOG Recovery in LNG Terminals
,” Siemens AG Energy, Duisburg, Germany, available at: http://www.energy.siemens.com/us/pool/hq/energy-topics/tradeshows/lng-16/BOG%20for%20receiving%20terminals.pdf
16.
Bhattacharya
,
D.
, and
Bandari
,
B.
,
2013
, “
Boil Off Gas System Design for Integrated Liquefaction and Regasification Facilities
,”
AIChE Spring Meeting and Global Congress on Process Safety
,
San Antonio, TX
, Apr. 29.
You do not currently have access to this content.