This paper describes in detail the design, construction, and testing of an active magnetic bearing (AMB) system for high-speed permanent magnet (PM) brushless DC motor (BLDCM) application. A back-to-back (BTB) test setup which consists of two BLDCMs connected by a high-speed flexible coupling is designed and built: the first one acts as the motor and the other one acts as the generator with resistive load. The dynamic model of the rigid rotor supported by AMBs, and its electromagnetic and feedback control design aspects are also provided. Mechanical design aspects are rotor assembly, radial AMB (RAMB), and thrust AMB (TAMB). Finally, full-loaded test results of the AMBs are given using the BTB experimental test setup that adopts two 100 kW electric machines supported by AMBs.
Skip Nav Destination
Article navigation
November 2015
Research-Article
Design, Modeling, Fabrication, Back-to-Back Test of a Magnetic Bearing System for High-Speed BLDCM Application
Bangcheng Han,
Bangcheng Han
Science and Technology on Inertial Laboratory,
e-mail: hanbangcheng@buaa.edu.cn
Beihang University
,Xueyuan Road
,Beijing 100191
, China
e-mail: hanbangcheng@buaa.edu.cn
Search for other works by this author on:
Shiqiang Zheng
Shiqiang Zheng
1
Science and Technology on Inertial Laboratory,
e-mail: zhengshiqiang@buaa.edu.cn
Beihang University
,Xueyuan Road
,Beijing 100191
, China
e-mail: zhengshiqiang@buaa.edu.cn
1Corresponding author.
Search for other works by this author on:
Bangcheng Han
Science and Technology on Inertial Laboratory,
e-mail: hanbangcheng@buaa.edu.cn
Beihang University
,Xueyuan Road
,Beijing 100191
, China
e-mail: hanbangcheng@buaa.edu.cn
Shiqiang Zheng
Science and Technology on Inertial Laboratory,
e-mail: zhengshiqiang@buaa.edu.cn
Beihang University
,Xueyuan Road
,Beijing 100191
, China
e-mail: zhengshiqiang@buaa.edu.cn
1Corresponding author.
Contributed by the Structures and Dynamics Committee of ASME for publication in the JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER. Manuscript received March 3, 2015; final manuscript received March 19, 2015; published online May 12, 2015. Editor: David Wisler.
J. Eng. Gas Turbines Power. Nov 2015, 137(11): 112504 (9 pages)
Published Online: November 1, 2015
Article history
Received:
March 3, 2015
Revision Received:
March 19, 2015
Online:
May 12, 2015
Citation
Han, B., and Zheng, S. (November 1, 2015). "Design, Modeling, Fabrication, Back-to-Back Test of a Magnetic Bearing System for High-Speed BLDCM Application." ASME. J. Eng. Gas Turbines Power. November 2015; 137(11): 112504. https://doi.org/10.1115/1.4030283
Download citation file:
Get Email Alerts
Cited By
Accelerating Chemical Kinetics Calculations with Physics Informed Neural Networks
J. Eng. Gas Turbines Power
Fully Coupled Analysis of Flutter Induced Limit Cycles: Frequency Versus Time Domain Methods
J. Eng. Gas Turbines Power (July 2023)
Impact of Ignition Assistant on Combustion of Cetane 30 and 35 Jet-Fuel Blends in a Compression-Ignition Engine at Moderate Load and Speed
J. Eng. Gas Turbines Power (July 2023)
Related Articles
Multiharmonic Adaptive Vibration Control of Misaligned Driveline via Active Magnetic Bearings
J. Dyn. Sys., Meas., Control (July,2008)
Rotordynamic Evaluation of Centrifugal Compressor Using Electromagnetic Exciter
J. Eng. Gas Turbines Power (March,2012)
Modeling the Gas Turbine Engine Under Its Dynamic Heating Conditions
J. Eng. Gas Turbines Power (March,2015)
A Detailed Modular Governor-Turbine Model for Multiple-Spool Gas Turbine With Scrutiny of Bleeding Effect
J. Eng. Gas Turbines Power (November,2017)
Related Proceedings Papers
Related Chapters
Outlook
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Introduction
Design of Mechanical Bearings in Cardiac Assist Devices
Stable Analysis on Speed Adaptive Observer in Low Speed Operation
International Conference on Instrumentation, Measurement, Circuits and Systems (ICIMCS 2011)