Unexpected outages and maintenance costs reduce plant availability and can consume significant resources to restore the unit to service. This paper describes a survey and analysis of unplanned outage events for 388 combined-cycle plants, based on 164 D/E-Class and 224 F-Class gas turbines. The 15-year timeframe included over 3000 unit-years of data. The causes and durations of forced outages and unscheduled maintenance were identified, and overall reliability and availability were established for each class of plant. Costs to restore the unit to service for each main outage cause were estimated, as were net revenues lost due to unplanned outages. A statistical approach to estimated costs and lost revenues provides a risk-based means to quantify the impact of unplanned events on plant cash flow as a function of class of gas turbine and plant subsystem. The risk-based assessment defines the range of probable costs of unplanned outage events.

References

1.
Grace
,
D.
and
Scheibel
,
J.
,
2001
, “
Technical Risks and Mitigation Measures in Combustion Turbine Project Development
,” ASME Turbo Expo 2001, New Orleans, LA, ASME, Paper No. 2001-GT-0472.
2.
Grace
,
D.
,
2008
, “
Combined-Cycle Power Plant Maintenance Costs
,” ASME Turbo Expo 2008, Berlin, Germany,
ASME
Paper No. GT2008-51357. 10.1115/GT2008-51357
3.
Grace
,
D.
,
2011
, “
Combined-Cycle Component Reliability Statistics: Technical Risk of Unplanned Outage Events
,” EPRI, Palo Alto, CA, Paper No. 1023079.
4.
Grace
,
D.
,
2011
, CTCC O&M Cost Analyzer, Version 8.5, EPRI, Palo Alto, CA: 2011, Software No. 1021728.
5.
Grace
,
D.
,
2011
,
SOAPP-CT Workstation
, Version 8.2, EPRI, Palo Alto, CA: Software No. 102165.
You do not currently have access to this content.