This paper presents the O&M experience at the Kalaeloa Cogeneration Plant. Performance issues and other problems related to firing heavy oil in a combustion turbine are presented together with their long-term solutions leading to the current successful operation of the IPP power station in Hawaii, USA.
Copyright © 2002
by ASME
You do not currently have access to this content.